2014 - BG, Easington Catchment Area Field Development Project, UK

2014 - BG, Easington Catchment Area Field Development Project, UK
2014 - BG, Easington Catchment Area Field Development Project, UK
2014 - BG, Easington Catchment Area Field Development Project, UK

Summary

The Easington Catchment Area project was designed to expand gas production capabilities in the southern North Sea, providing a stable energy supply to the UK. The development required the integration of new offshore production wells and tie-ins to existing infrastructure.

Challanges

Ensuring that new infrastructure was designed for maximum reliability while maintaining safety compliance, given the harsh offshore environment.

Solution

  • Conducted detailed reliability block diagram (RBD) modeling to assess system performance and redundancy requirements.

  • Applied LOPA and SIL verification to ensure functional safety compliance for critical systems.

  • Developed an asset performance optimization plan, identifying key areas for reliability improvements and failure mitigation.

  • Recommended advanced condition monitoring systems to enhance predictive maintenance capabilities.