2025 - TenneT – IJmuiden Ver Gamma, 2 GW Offshore Wind Farm, Netherlands
Summary
IJmuiden Ver Gamma is one of the largest offshore wind energy infrastructure projects, focusing on maximizing grid stability and energy transfer efficiency through advanced HVDC technology.
Challanges
Managing reliability risks associated with the large-scale integration of offshore wind energy. Reducing unplanned maintenance interventions by improving failure detection and response strategies. Ensuring safety compliance while enhancing asset performance under stringent offshore operational constraints.
Solution
Conducted RAM modeling to develop an optimal redundancy and maintenance strategy, improving system uptime.
Used condition-based monitoring techniques, including thermal imaging, vibration analysis, and electrical diagnostics, to improve predictive maintenance.
Provided quantitative risk assessments (QRA) and functional safety evaluations, ensuring a resilient and compliant system design.
Aligned reliability strategies with IEC 603000-3-1 and ISO 20815, supporting the long-term performance of offshore assets.