2003 - BG, ECA Field Development – CHAOS Explosion Modelling, UK
Summary
The ECA Field Development project required advanced explosion modeling to assess potential blast hazards and mitigate risks associated with hydrocarbon releases. Given the complexity of offshore environments, ensuring the structural integrity of critical assets was paramount.
Challanges
Understanding the potential blast loads generated from hydrocarbon releases and their impact on offshore platforms. Ensuring that safety-critical equipment and escape routes were adequately protected. Compliance with offshore.
Solution
Conducted Computational Fluid Dynamics (CFD) simulations using CHAOS explosion modeling software to predict explosion overpressure effects.
Analyzed blast wave propagation and its impact on structural components, safety barriers, and personnel areas.
Recommended design modifications, including blast-resistant walls, improved layout configurations, and explosion venting strategies to mitigate risk.
Provided insights for Fire and Gas Detection System (FGDS) placement, enhancing early leak detection and response measures.