Summary

This project was focused on enhancing oil recovery by injecting water into the reservoir to maintain pressure and maximize production efficiency in the ACG field.

Challanges

Ensuring the reliability of water injection systems while minimizing downtime and optimizing maintenance.

Solution

  • Developed an availability model to assess injection system reliability and optimize performance.

  • Conducted FMECA and RAM assessments to prioritize critical components and failure modes.

  • Designed redundancy and maintenance strategies to reduce unplanned downtime.

  • Facilitated SIL and LOPA studies to ensure functional safety compliance.