2024 - TenneT BalWin 4, 2 GW Offshore Wind Farm, Netherlands

2024 - TenneT – BalWin 4, 2 GW Offshore Wind Farm, Netherlands
2024 - TenneT – BalWin 4, 2 GW Offshore Wind Farm, Netherlands
2024 - TenneT – BalWin 4, 2 GW Offshore Wind Farm, Netherlands

Summary

The BalWin 4 project is a high-capacity offshore wind transmission system, designed to integrate 2 GW of renewable energy into the European grid using high-voltage direct current (HVDC) technology. The project involves multiple offshore converter platforms to ensure a stable energy supply.

Challanges

Ensuring high system availability for offshore converter platforms while meeting stringent RAMS requirements and addressing vendor delays.

Solution

  • Developed RAM models to assess component failure risks and optimize redundancy strategies.

  • Conducted Failure Modes, Effects, and Criticality Analysis (FMECA) workshops to ensure system reliability.

  • Led spare parts optimization planning, ensuring stock availability while preventing excess inventory.